Our design process
START. Open dialogue. Thorough background information. Common goal.
OPTIONS. Influencing cost frameworks already at this stage. Sustainable development perspective.
DESIGN. Concrete solutions for evaluation by all parties.
Steps in our design process
Start
At the beginning of the project, we review the wishes of both the architect and the client about the general solutions of the project. Based on this, we draw up the main fire engineering lines for the project and prepare a preliminary fire safety plan for the guidance of the design team. The best possible result is achieved when a fire engineer is involved in the construction project from the very beginning. This enables fire safety solutions to be optimized from the choice of the building’s fire class, avoids problems associated with poorly designed solutions, and ensures the smoothness of the project from the implementation phase to maintenance.
Options
In the initial phase of the project (of course also in the later stages), alternative solutions to fire engineering issues can be presented. This allows the customer and other designers to choose the most suitable fire protection solutions for their needs. At this stage, it is also possible to point out possible savings targets that can be realized with performance-based fire safety design.
Design
The fire-fighting solutions of the site will be presented to the rescue authority. Any input data for performance-based design will also be accepted. The fire design and possible performance-based fire safety design will be completed on the basis of the agreed initial data. The plans are updated as needed.
Approval
Final updated fire plans and performance based designs will be presented to the rescue and building control authorities before applying for a building permit. Plans approved by the authorities are uploaded to Lupapiste (Finnish online service for applying for permits for the built environment) and stamped if necessary. In some cases, performance-based design or site-specific expert opinions are approved by the authorities even after applying for a building permit. This may require adding a construction change drawing (rakentamisen aikainen muutospiirustus, RAM) to the project.
Control
The fire consultant monitors the fire engineering implementation of the site during the construction phase so that the fire engineering solutions are implemented correctly and according to plan. This avoids later problems, for example, during the commissioning phase of a building. During the construction phase, a fire consultant can still assist the contractor with fire engineering issues that arise at the site.