COMMERCIAL BUILDINGS
2023
- Stark Helsinki Konala, Helsinki. Fire safety engineering (2022-2023).
- Motonet, Kirkkonummi. Performance-based fire safety design of load-bearing steel structures (2023).
- K-Market Woikantori, Kouvola. Smoke extraction design (2023).
- Tervasaaren aitta, Helsinki. Fire safety engineering (2023).
- Tapiolan teollisuustalo, Espoo. Fire engineering survey and fire safety design (2023).
2022
- Kouvolan Prisma supermarket, Kouvola. Evacuation simulation (2021-2022).
- Savonlinnan ABC, Savonlinna. Smoke clearance plans (2022).
- S-Market Turenki grocery store, Janakkala. Risk analysis (2022).
- Päivölän liikekeskus, Seinäjoki. Fire engineering, fire simulations and risk analysis (2022).
- OP Forum, Jyväskylä. Basic building improvement, fire safety design of steel structures (2022).
- Ristipellontie, Helsinki. Fire engineering design of a hardware store and warehouse building (2022).
2021
- Päivölän liikekeskus, Seinäjoki. Fire simulation (2021).
- S-Market Näsi grocery store, Porvoo. Fire technical statement (2021).
- Forum Liikekeskus shopping mall, Jyväskylä. Fire technical statement (2021).
- Pektra Kamux, Oulu. Risk analysis (2021).
- Vantaan Kivistön palvelukeskittymä, Vantaa. Fire engineering design, smoke clearance design, fire simulation (2020-2021).
- S-Market Tammisaari, Tammisaari. Fire simulation (2019-2021).
- Vaasan Liisanlehdon Prismakeskus, Vaasa. Fire engineering design, fire simulation, smoke clearance design, fire engineering statements (2019-2021).
- Jyväskylän Forum muutos, Jyväskylä. Fire engineering design, smoke clearance design, fire simulation (2020-2021).
2020
- S-Market Idänpää, Hämeenlinna. Fire engineering design, fire simulation, smoke clearance design (2020).
- Sokos, Porvoo. Fire engineering design of renovation works (2019-2020).
- Kauppakeskus Pekuri, Oulu. Fire Technical Statement (2020).
- S-Market Jukola, Hämeenlinna. Smoke clearance design (2020).
- S-Market Vääksy, Vääksy. Risk analysis (2020).
- Veho Pori, Pori. Smoke clearance design (2020).
- Lidl Vaasa, Vaasa. Smoke clearance study (2020).
- Prisma Lappeenranta, Lappeenranta. Fire engineering design, smoke clearance design, fire simulation (2019-2020).
- Kivenlahden Liikekeskus, Espoo. Fire engineering design, smoke clearance design (2020-).
2019
- Koy Puistotie 3, Järvenpää. Fire engineering design and smoke clearance design (2019).
- Koy Kvartsikatu 2, Vaasa. Fire technical statement (2019).
- K-Market Ukko-Pekka, Hyvinkää. Fire safety design (2019).
- Tunturihotelli Iso Syöte, Pudasjärvi. Fire safety design (2019).
- Aviapolis business premises, Vantaa. Fire engineering plan (2019).
- Prisma Lappeenranta, Lappeenranta. Fire engineering plan (2019).
- S-Market Nikkilä, Sipoo. Fire engineering plan (2019).
2018
- Shopping center Metropol, Joensuu. Smoke removal plan (2018).
- Otava Uudenmaankatu 10-12, Helsinki. Fire engineering and smoke ventilation design (2018).
- Prisma, Pieksämäki. Fire safety design (2018).
2017
- Laakkonen Herttoniemi, Helsinki. Fire safety design (2017).
- Vartimar Oy Martinkyläntie 39, Vantaa. Fire technical fire door statement (2017).
- Autotalo Laakkonen, Raisio. Fire safety design (2017).
- Prisma, Nummela. Fire safety design (2017).
- S-market in Söderkulla, Sipoo. Fire safety design (2017).
- Hagelstamintie 28, Vaasa. Fire engineering statement (2017).
- Hämeentie 11, Helsinki. Fire engineering plan (2017).
2016
- ABC Renkomäki, Renkomäki. Plans for smoke clearance (2016).
- K-rauta, Holma. Fire safety design (2016).
- CM Sastamala, Sastamala. Fire simulation (2016).
- Lion Quarter Restaurant, Helsinki. Fire technical statement on fire doors (2016).
- KOY Tampereen Kaukajärvi Vinkkeli, Tampere. Fire measurement of steel structures (2016).
- Autotalo Laakkonen, Porvoo. Fire engineering statement (2016).
- Oy Backman-Trummer Ab, Vasklot. Smoke removal simulations (2016).
- Elovainio Business Center, Elovainio. Simulations of steel structures (2016).
- Heureka, Vantaa. Fire block plan (2016).
- RC Motoring Hall Fullspeedrc ry, Vantaa. Fire Breakdown Plan (2016).
- KOy Ankkuri, Espoo. Fire safety design (2016).
- Kiinteistö Oy Kehäportti, Vantaa. Fire block plan (2016).
- Kiinteistö Oy Rajalla, Tornio. Third party statement (2016).
- Lidl, Laukaa. Fire safety design (2016).
- Lippulaiva 3 osa, Espoo. Fire engineering statement (2016).
- Motonet, Kerava. Fire simulations (2016).
- Ruoholahti shopping center, Helsinki. Technical statement from fire doors (2016).
- Stockmann, Turku. Fire safety design (2016).
- Ravintola Savotta, Helsinki. Fire safety design (2016).
2015
- KOY Parkitus, Seinäjoki. Fire safety design (2015).
- Liiketalo Myyrinraitti, Vantaa. Fire safety design (2015).
- Sofiankatu 4, Helsinki. Fire safety design and plans for smoke clearance design (2014-2015).
- Mercedes-Benz Airport, Vantaa. Smoke Extraction Planning And Fire Breakdown Plan (2014-2015).
- Laattapiste, Vantaa. Fire safety design and plans for smoke clearance design (2014-2015).
- Zsar-kauppakeskus, Vaalimaa. Fire engineering design (2014-2015).
- Prisma Imatra, Imatra. Fire engineering design and smoke extraction design, functional fire measurement, and fire and exhaust simulations (2013-2015).
- Audi Center, Espoo. Fire safety design and plans for smoke clearance design (2014-2015).
2014
- Kauppakeskus Revontuli, Rovaniemi. Fire engineering statement (2014).
- Ikea / Ikano, Lappeenranta. Opinion on fire and escape simulations (2014).
- K-Rauta Måttisenpuisto, Kokkola. Functional fire measurement of fire resistance of steel structures (2014).
- KOY Lahden Kulmala, Lahti. Fire engineering statement (2014).
- K-Rauta , Tampere. Functional fire measurement of fire resistance of steel structures (2014).
- K-Supermarket, Hollola. Store risk analysis (2014).
- Liikerakennus Palmrothintie, Tampere. Functional fire measurement for fire resistance of steel structures (2013-2014).
- Lintsiburger, Helsinki. Fire safety design (2013-2014).
2013
- Kauppakeskus Ruoholahti, Helsinki. Opinion on a fun park exit simulation (2013).
- Kauppakeskus Iso Kristiina, Lappeenranta. Opinion on fire and evacuation simulation (2012-2013).
- KCM Kokkola, Kokkola. Fire engineering design and functional fire sizing, fire and exit simulations (2012-2013).
- Prisma Kokkola, Kokkola. Fire engineering design and functional fire sizing, fire and exit simulations (2012-2013).
- Lampan talo, Helsinki. Functional fire measurement, fire resistance of roof structures and roof glass (2012-2013).
- Jyväskylän Forum, Jyväskylä. Renovation and alterations, smoke and exhaust simulations (2009-2013).
2012
- Hartmann jakeluvarasto, Espoo. Third party statement on fire engineering solutions (2012).
- KCM Joensuu, Joensuu. Fire roof technical report (2012).
- Klinkkerikaari 12, Vantaa. Smoke removal planning (2011-2012).
- Ikea, Kuopio. Third party statement on fire engineering design (2011-2012).
- Porvoon taidetehdas, liikerakennus, Porvoo. Fire engineering design of a commercial building (2011-2012).
- Ikano, Kuopio. Third party statement on fire engineering design (2011-2012).
- Prisma Hyllykallio, Seinäjoki. Functional fire measurement of the extension, fire and exit simulations (2010-2012).
- Hyvinkään ykköskeskus, Hyvinkää. Fire engineering design (2008-2012).
2011
- Koskikeskus, Tampere. Opinion on the design of smoke extraction (2011).
- Otavan kirjakauppa, Helsinki. Fire engineering design for alterations (2011).
2010
- Kauppakeskus Karisma, Lahti. Fire roof technical report (2010).
- Ylivieskan Prisma, Ylivieska. Fire engineering design (2009-2010).
- Kuninkojan kotikeskus, Raisio. Opinion on the fire resistance of load-bearing steel structures (2009-2010).
- Launeen Prisma, Lahti. Fire resistance of load-bearing steel structures of extensions (2009-2010).
2009
- Koivukylän CityMarket, Vantaa. Opinions on some partitioned door structures (2009).
- Arabiankeskus, Helsinki. Fire engineering consulting (2009).
- Raision Mylly, Prisma, Raisio. Fire resistance of load-bearing steel structures (2009).
- KCM Kivihaka, Vaasa. Extension project planning (2009).
- Ideapark, Kiiminki. Project planning (2009).
- Mikkelin kortteli 5, Mikkeli. Fire safety design (2008-2009).
- Kodin Terra, Hämeenlinna. Modifications and extensions (2008-2009).
- Martintorin liikerakennus, Vantaa. Fire safety design (2008-2009).
- VW Center, Vantaa. Modifications and fire engineering consulting for the extension (2008-2009).
- Audi Center, Vantaa. Fire safety design (2008-2009).
- Veho Koivuhaka 2, Vantaa. Fire safety design (2008-2009).
2008
- Graanin liikekeskus, Mikkeli. Fire engineering design (2008).
- Veho Olari, Espoo. Fire engineering design of the extension (2008).
- ABC Lohja, Lohja. Fire engineering design (2008).
- Lahden Sokos, Lahti. Smoke removal simulations (2008).
- LIDL Inkilänmäki, Kuopio. Opinion on fire safety (2008).
- Kilpakujan liikekiinteistö, Vantaa. Smoke extraction planning (2008).
- Oulun Masku, Oulu. Fire Statement for Steel Structures (2008).
2007
- Delta-Auto Koskelo, Espoo. Project planning phase (2007).
- Kauppakeskus Centrum, Lahti. Statement of Fire Doors (2007).
- K-Citymarket, Klaukkala. Fire engineering design (2007).
- Kauppapuisto, Turku. Fire engineering design (2007).
- Liikekeskus Holma, Lahti. Fire engineering design (2007).
- Viikin Prisma, Helsinki. Fire Door Statement (2007).